THERE are delays of up to 60 minutes on Gatwick Express trains and the disruption is likely to last until about 8pm.
The delays are on the London Victoria to Brighton route as well as the London bridge to Brighton route.
This is due to emergency engineering work at Haywards Heath and a speed restriction which has been imposed in the area.
↧